Requires a Certifed Trained Installer for ReDriven Products

ReDriven Turbines are manufactured in China. The control panel is Canadian and the inverters are from Italy. Some hardware components and accessories are from the USA

Shipping FOB: Port of Call Excise Tax Not Included

Grid-Tied Description Price
5 KW PACKAGE FD6.4‐5000 INCLUDING GENERATOR, BLADES, FLANGE, 5KW ON‐GRID CONTROLLER, RESISTIVE LOAD, PVI‐6000 INVERTER $14,200.00
10 KW PACKAGE FD8.0‐10K INCLUDING GENERATOR, BLADES, FLANGE, 10 KW ON‐GRID CONTROLLER, 2 PVI‐6000 INVERTERS, RESISTIVE LOAD, 1 ISOLATION TRANSFORMER $21,300.00
20 KW PACKAGE FD12.20 KW ON‐GRID CONTROLLER0‐20K INCLUDING GENERATOR, BLADES, FLANGE, 4 PVI‐6000 INVERTERS, RESISTIVE LOAD, ISOLATION TRANSFORMERS $41,100.00
50 KW PACKAGE FD13.2‐50K INCLUDING GENERATOR, BLADES, FLANGE, 50 KW ON‐GRID CONTROLLER, INVERTERS, RESISTIVE LOAD, ISOLATION TRANSFORMERS $124,200.00

Tower Pricing Includes Base\Embedment Plate & Anchor Bolts Shipping FOB: Port of Call Excise Tax Not Included

5 or 10 Kw Tower Pricing Cost
18 Meter (60 foot) Hydraulic Monopole $14,600.00
24 Meter (80 foot) Hydraulic Monopole $18,700.00
30 Meter (100 foot) Hydraulic Monpole $28,900.00
36 Meter (120 foot) Hydraulic Monopole $38,300.00
20 Kw Tower Pricing Cost
18 Meter (60 foot) Hydraulic Monopole $16,600.00
24 Meter (80 foot) Hydraulic Monopole $22,000.00
30 Meter (100 foot) Hydraulic Monpole $32,300.00
36 Meter (120 foot) Hydraulic Monopole $44,300.00
50 Kw Tower Pricing Cost
18 Meter (60 foot) Hydraulic Monopole $17,600.00
24 Meter (80 foot) Hydraulic Monopole $23,500.00
30 Meter (100 foot) Hydraulic Monpole $34,097.00
36 Meter (120 foot) Hydraulic Monopole $48,000.00

20 kw Control Set-Up

Clean Energy For America

Point of use wind systems

Michigan Wind Turbine & Tower

You are viewing the text version of this site.

To view the full version please install the Adobe Flash Player and ensure your web browser has JavaScript enabled.

Need help? check the requirements page.

Get Flash Player